The following topics represent the core knowledge areas that every
professional engineer must master to operate effectively in the construction
industry. Covering key disciplines such as contract practice, procurement,
cost management, programming, and professional ethics, these competencies
form the foundation of a well-rounded professional. A thorough understanding
of all topics listed below is essential for any engineer aiming to reach a
recognised level of professional competence and credibility in the field. In
this Handbook.
I will strive to cover all these areas comprehensively, providing
practical insights and structured guidance to help professionals
strengthen their expertise across these critical domains.
Contract Practice & Administration
- General
- Principles of contracts and legislation
- Standard forms of main and sub-contract (e.g. FIDIC, JCT, NEC, ICC, ACA, IChemE)
- Roles and responsibilities of parties (Engineer, PM, Employer’s Rep, QS)
- What is NEC Contracts?
- What is JCT Contracts?
- What is the The Infrastructure Conditions of Contract (ICC)
- Contractual Concepts
- Performance security, bonds, and parent company guarantees
- Insurances (CAR, PII, Employer’s Liability, Professional Indemnity)
- Letters of Intent (LOI) and Letter of Acceptance (LOA)
- Pay-less notices and payment time-bars
- Third-party rights and collateral warranties
- Materials on/off site
- Assignment and novation
- Fluctuations and price adjustment formulae (NEDO indices)
- Retention and retention bonds
- Sectional completion and partial possession
- Contractor's Design portions
- Performance-specified works
- Named and nominated subcontractors
- Force majeure and exceptional events
- Back-to-back subcontract provisions
- Time at Large
- Provisional sum & Prime cost
- FIDIC Related
- What are FIDIC Contracts?
- FIDIC Contract Types: Choosing the right FIDIC form for your project
- Silver or Yellow contract for design-built/EPC
- FIDIC - Advance payments, interim valuations, and payment provisions
- Determination and termination clauses
- Commercial/QS related clauses
- Defects liability and rectification period
- Final accounts and completion
- Change, Claims, and Time (FIDIC)
- Variation orders / Compensation events
- Change procedures and valuing change
- Extensions of time
- Delay and disruption principles
- Claims, loss, and expense
- Global claims
- Liquidated and delay damages
- Notices and time-bar provisions
- Prolongation Claim
- Dispute Avoidance and Resolution
- Dispute avoidance and resolution (DAB/DAAB, adjudication, arbitration, mediation)
- Adjudication process (HGCRA 1996)
- Arbitration process (Arbitration Act 1996)
- Expert determination
- Scott Schedule preparation
- Without prejudice communications
Quantification and Costing of Construction Works
- Methods of Measurement
- Methods of measurement (e.g., NRM Volumes 1, 2 and 3, CESMM4, POMI).
- RICS Code of Measurement Practice and International Property Measurement Standards (IPMS).
- Taking-off quantities and computerised measurement tools.
- Building Information Modelling (BIM) data extraction and input.
- Understanding RICS Area Classifications: A Guide to GEA, GIA, and NIA
- Estimating and Pricing
- Preparation of pricing documents (Bills of quantities, schedules of works, schedules of rates).
- Provisional sums and prime cost sums.
- Elemental cost planning and approximate estimating methods.
- Analysis of price and tender returns.
- Preliminaries costing and pricing.
- Contractor's all-in rate build-up.
- Labour, plant, and material cost analysis.
- On-costs, overheads, and profit margins.
- Cost Control and Commercial Management
- Target cost and pain/gain mechanisms.
- Dayworks accounts.
- Valuation of works (interim valuations, valuing change, loss and expense, final account).
- Reporting on cost (tender report, correcting errors, post-contract financial reporting).
- Cash flow forecasting at tender and post-contract stage.
- Final account negotiations and agreement procedures
- Variations valuation under different contract forms
- Cost benchmarking against market data (BCIS indices)
- Procurement and Subcontracting
- Subcontract procurement and domestic subcontractor pricing.
Procurement and Tendering
- General
- Procurement strategy selection aligned to client objectives
- Standard roles of tendering, codes of practice, and electronic tendering
- Public procurement regulations
- Procurement Types
- Types of procurement (Traditional, Design and Build, Management Contracting, Construction Management, EPC/Turnkey, PPP/PFI)
- Financial basis (Lump sum, Re-measured, Cost Reimbursable, Target cost, Management contracts)
- Tendering Process
- Single and two-stage tendering (competitive and negotiated)
- Compilation of tender lists and pre-qualifying contractors (PQQ/SQ)
- Preparation and compilation of tender documentation
- Instructions to tenderers
- Tender analysis, evaluation, and tender reports
- MEAT criteria and quality/price weighting
- Dealing with errors and qualifications in tenders
- Pre and post tender estimates.
- Full life-cycle for tendering process for Provisional sum packages (by Sub-contractors)
- Procurement Terms and Arrangements
- Employer's requirements and contractor's proposals (D&B)
- Partnering (project and strategic)
- Framework agreements
- Novation of design consultants
- Supply chain management and subcontractor procurement
- Open-book accounting and transparency requirements
- Contractor Perspective
- Bid management and contractor's tender process
- Tender risk assessment and pricing strategy
Project Finance (Control and Reporting)
- Cost Control & Forecasting
- Post-contract cost control
- Change control procedures and forms
- Cost reporting and forecasting (cost-to-complete)
- Cost-value reconciliation (CVR)
- Cash flows
- Earned value management (EVM)
- WIP and accruals in construction accounts
- Financial Performance
- Turnover, margin, and contribution analysis
- Final accounts
- Interim payment mechanisms and certificate process
- Employer's agent financial reporting duties
- Financial close and project funding drawdown
- Change & Risk Management
- Risk management and quantification
- Value engineering
- Loss and expense
- Early warning notices and compensation event management (NEC)
- Benchmarking and best value
- Payment Processes
- Change control procedures and forms
Programming and Planning
- General Planning
- Project programming and multi-project programming
- Pre-contract planning and programming techniques
- Programme requirements of different forms of contract
- Project execution plans (PEP) and project handbooks
- Establishing team roles and responsibilities
- RIBA Plan of Work and project stage gates
- Planning Techniques
- Planning techniques (Gantt charts, network analysis, critical path analysis, flow diagrams, activity schedules)
- Key milestones and float
- Master programme vs construction programme
- Progress Monitoring
- Cash flows and forecasting expenditure
- Progress monitoring and S-curves
- Resource loading and levelling
- Short-term and look-ahead programmes
- Delay & Completion
- Impact of change on programmes
- Delay analysis methods (time impact analysis, impacted as-planned, windows analysis)
- Sectional and phased completion programming
- Commissioning, handover procedures, and close-out reports
Design Economics and Cost Planning
- General Cost Planning
- Economics of design (site density, wall/floor ratio, storey heights, lettable/non-lettable areas)
- Cost planning at each RIBA stage (concept to technical design)
- Employer's requirements cost planning (D&B projects)
- Developer's budget and cost plan structure
- Cost Data & Inflation
- Sources of cost data (BCIS, external sources)
- Tender and construction inflation
- Location factors and currency fluctuations
- Benchmarking of elemental unit rates
- Estimating Techniques
- Order of cost estimates and elemental cost plans (NRM1)
- Feasibility studies and viability appraisal
- NPV, IRR, and payback period
- Value & Lifecycle Analysis
- Life cycle costing and whole life costing
- Value engineering and value management
- Value management workshops and FAST diagrams
- Risk management and analysis (contingency allowances)
- Capital cost vs whole-life value trade-offs
- Post-occupancy evaluation and cost-in-use analysis
Construction Technology and Environmental Services
- Building Construction
- Demolition and site preparation
- Foundation systems and substructures
- Major earthworks and tunnelling
- Superstructures (frames, bridges) and building envelopes (external walls, roofs)
- Internal structures, finishes, fixtures, and fittings
- External works, landscaping, road, pavement, and rail track works
- Services installations (mechanical, electrical, underground drainage, transportation systems)
- Engineering structures and energy plants
- Regulations & Sustainability
- Sustainable construction methods and materials
- BIM and digital construction technology
- Temporary works and construction methodology
- Offsite manufacturing and modular construction
- Building regulations and planning requirements
- Environmental impact assessment basics
- Health and safety in construction (CDM 2015)
- Net zero carbon and green building standards (BREEAM, LEED)
